My company in May 17, 2015 to submit material purchasing quotation table, types of materials: lifting casing, lifting bolt, cement block, the three group of Liaoning section of Beijing Shenyang passenger dedicated TJ-12 standard field leadership review and related personnel after the delivery of Fu mask, the price has been received, was identified as the winning bidder.
My company in August 3, 2015 submitted by the new Beijing to Shenyang railway passenger dedicated line of Beijing and Hebei (Hebei section) bid No.: JSJJ2015-01 number, contact net pre buried channel CD02-5b tunnel, the tender documents have been China water conservancy and hydropower Third Engineering Bureau Ltd. Beijing Shenyang passenger dedicated Jingji section V command, was identified as the winning bidder.
My company in August 3, 2015 submitted by the eleven Bureau of China Railway Group Co. Ltd. Beijing Shenyang passenger dedicated Jingji VII headquarters (bid No.: JSJJ2015-01, tunnel contact net pre buried channel CD04-7b package) bid has been accepted, was identified as the winning bidder.
My company in August 3, 2015 submitted by the new Beijing to Shenyang railway passenger dedicated line of Beijing and Hebei (Hebei section) bid No.: JSJJ2015-01, contact CD03-6b tunnel net pre buried channel package bidding documents has been in the first navigational Engineering Bureau Ltd. Beijing Shenyang passenger dedicated Jingji VI bid section command is determined to accept, the winning bidder.
Anhui railway station two standard project manager of our company in March 7, 2014 submitted by the thirteen Bureau of China Railway Hefei Fuzhou since the purchase of materials tender bid documents for HFZGZB-2014-01 package number HFCL-2-1 has been accepted, was identified as the winning bidder.
The new station in Anhui section of Hefei to Fuzhou railway company on April 21, 2014 submitted and related project two standard silicone caulking material competition negotiation (negotiation No. HFZGZB-2014-02) bid has been accepted, was identified as the turnover of people.
Our company took part in the Beijing Shenyang high-speed rail project polyurethane insulation board (tender No.: POWERCHINA-03-14-057) the invitation on November 6, 2014 received Chinese water conservancy and hydropower Third Engineering Bureau Co. Ltd. Luqiao branch of Beijing Shenyang Jingji V bid of the project department issued a notice of the bid, recognised in my unit bid.
My company in March 26, 2013 submitted by the CCCC Gansu Lanzhou Xinjiang Railway Project Manager since the purchase of materials whose number is: ZJYHJLX2013-04 QFJ-1 package bid has been accepted, was identified as the winning bidder.
My company in May 29, 2013 the CCCC Beijing Fuzhou railway passenger dedicated Fujian Jiangxi II Standard Project Manager Material Design Department accepted the bidding of Liaoning Yixing Industrial Limited company of two component polyurethane sealants and silicone caulking materials, tender number: 201305. Was identified as the winning bidder.